Home

The Project Launch

The Preparation

The Background

The Workshop Construction Phase

Press Items

First Tesserae Laid

Progress as at 1st December 2005

Progress Pictures - as at December 20

Stanway Roman Doctor's Grave

Progress as at 23 January 2006

Progress as at 23 February 2006

15 March - 8 characters completed

Companion mosaics are grouted

Progress as at 22 April 2006

Last tile laid on the first half - 5 May

Operation Lift & Shift - 10 May

Open Days

Progress as at 2 June 2006

Progress at 19 June 2006 & Anne Schwegmann-Fielding's Roman Watering Can

Progress as at 12 July 2006

Second half almost finished!!

|

|
 |
 |

The Preparation
Location: Essex
Before the project could be launched there was an enormous amount of preparation work required. This included researching various materials for making the mosaic and also deciding which production method should be used. One critical activity was making an A3 sample of the mosaic to ensure that we were comfortable with scaling this up to a vast 20 foot by 10 foot.
In addition, we needed to prepare a DVD showing all potential mosaic builders how to build a mosaic in 15 minutes! This was presented by local mosaic artist Anne Schwegmann-Fielding (who will be working with the children to inspire them in designing the companion mosaic and providing advice on mosaic construction methods to the project Manager Peter Herring) and shot by John Jones of the Philip Morant School & College Media Studies department.
|
|
 |
 |